321.  Scheduling is
A. alloting a job to an operator B. alloting a job to a machine
C. fixing the time of completition of a job D. detailing the sequence of operation job wise and machine wise

322.  Expediting is watching
A. flow of material B. worker's activity
C. minimizing delay D. none of the above

323.  Who proposed that all human efforts can be measured in terms of a common unit partly composed of actual work and partly of compensating relaxation?
A. Emerion B. Taylor
C. Gantt D. Bedaux

324.  Control of production is done through
A. scheduling B. follow up
C. dispatching D. none of the above

325.  Break even analysis requires
A. fixed cost B. variable cost
C. income D. none of the above

326.  At break-even point, total cost is equal
A. fixed cost B. variable cost
C. income D. none of the above

327.  M.T.M. helps in
A. Establishing time standards B. Estimating cost
C. Improving existing methods D. Developing methods before the starting of production
E. All of the above    

328.  Dispatching involves
A. starting the work B. making plan correction
C. collection data D. none of the above