| 81. |
A hydrograph representing one cm of run off from a rainfall of some unit duration and specific area distribution is known as |
| A. |
hyetograph |
B. |
flood hydrograph |
| C. |
unit hydrograph |
D. |
S-hydrograph |
Answer: Option C
Explanation:
|
| 82. |
Run-off is measured in |
| A. |
m3/s |
B. |
m3/min |
| C. |
m3/h |
D. |
none of these |
Answer: Option A
Explanation:
|
| 83. |
Flood frequency denotes the likelyhood of flood being equalled or exceeded. |
Answer: Option A
Explanation:
|
| 84. |
A canal sligned nearly parallel to the contours of a country, is known as |
| A. |
side slope canal |
B. |
contour canal |
| C. |
water shed canal |
D. |
ridge canal |
Answer: Option B
Explanation:
|
| 85. |
A canal aligned roughly at right angles to the contours of the country is called ridge canal. |
Answer: Option B
Explanation:
|
| 86. |
The water shed canal is also called |
| A. |
side slope canal |
B. |
contour canal |
| C. |
ridge canal |
D. |
all of these |
Answer: Option C
Explanation:
|
| 87. |
Irrigation canals are generally aligned along |
| A. |
contour line |
B. |
water shed |
| C. |
straight line |
D. |
valley line |
Answer: Option B
Explanation:
|
| 88. |
A canal aligned at right angles to the contour of a country, is known as |
| A. |
side slope canal |
B. |
contour canal |
| C. |
water shed canal |
D. |
branch canal |
Answer: Option A
Explanation:
|
| 89. |
The alignment of a canal |
| A. |
should be such, so as to ensure minimum number of cross drainage works |
B. |
on a water shed is the most economical |
| C. |
should avoid valuable properties |
D. |
all of the above |
Answer: Option D
Explanation:
|
| 90. |
Inundation canals draw their supplies from rivers whenever there is a |
Answer: Option B
Explanation:
|