https://www.geekmcq.com/
CSS Solved Papers
Physics Chemistry

Engineering :: Irrigation Engineering


  The alignment of a canal
[A]. should be such, so as to ensure minimum number of cross drainage works[B]. on a water shed is the most economical
[C]. should avoid valuable properties[D]. all of the above

Answer: Option D


Write your comments here:
Name *:     Email:

© 2012-2024 by GeekMCQ™ Technologies. All Rights Reserved | Copyright | Terms of Use & Privacy Policy | Referals

Contact us: info@geekmcq.com