231. |
The prevent the cement bags from any possible contact with moisture, the main point that should be kept in mind is that the |
A. |
space between the exterior walls and piles should be 30 cm |
B. |
cement bags should be placed closer together in the piles |
C. |
width and height of the pile should not exceed 3 m and 2.70 m respectively |
D. |
all of the above |
Answer: Option D
Explanation:
|
232. |
In designing a ware-house, it is assumed that |
A. |
each bag contains 50 kg of cement |
B. |
floor area occupied by one bag of cement is 0.3 m2 |
C. |
height of each cement bag containing 35 litres of cement is 0.18 m |
D. |
all of the above |
Answer: Option D
Explanation:
|
233. |
The 'first-in, first-out' rule should eb applied when cement hags are to be removed from the ware-house. |
Answer: Option A
Explanation:
|
234. |
Which of the following statement is wrong? |
A. |
If the height of pile exceeds 1.44 m, the cement bags should be arranged in header and stretcher fashion. |
B. |
The cement bags should be rolled on the floor when it is taken out for use. |
C. |
The strength of cement decreases with the passage of time. |
D. |
none of the above |
Answer: Option D
Explanation:
|
235. |
The capcity of a ware-house depends upon the |
A. |
floor area occupied by one cement bag |
B. |
height to which the cement bags are piled |
C. |
either (a) or (b) |
D. |
both (a) and (b) |
Answer: Option D
Explanation:
|
236. |
If the effective plan area of a warehouse is 54 m2, and the maximum height of pile permitted is 2.7 m, then the number of cement bags to be stord is |
Answer: Option D
Explanation:
|
237. |
The process of proper and accurate measurement of all concrete materials for uniformity of proportions and aggregate grading is called |
A. |
proportioning |
B. |
grading |
C. |
mixing |
D. |
batching |
Answer: Option D
Explanation:
|
238. |
The importance of batching is to obtain |
A. |
strength |
B. |
workability |
C. |
durability |
D. |
all of these |
Answer: Option D
Explanation:
|
239. |
Weight batching is done by |
A. |
spring dial scale |
B. |
platform weighing machine |
C. |
portable weigh batchers |
D. |
all of these |
Answer: Option D
Explanation:
|
240. |
When the batching of material is done by weight |
A. |
the bucket in which the material is to be weighed should be cleaned thoroughly |
B. |
the weighing machine should be levelled before placing the material |
C. |
the chart should be prepared indicating the weight of each material used for different strengths of concrete |
D. |
all of the above |
Answer: Option D
Explanation:
|