251. |
The diameter of the pipe line used for transportation of concrete by pumps should not exceed |
Answer: Option C
Explanation:
|
252. |
To prevent segregation, the concrete should not be thrown from a height of more than |
Answer: Option B
Explanation:
|
253. |
The placement of concrete should be discontinued during rainy periods |
Answer: Option A
Explanation:
|
254. |
The concrete |
Answer: Option A
Explanation:
|
255. |
The placing of concrete should start width-wide in reinforced cement concrete slabs from one end. |
Answer: Option A
Explanation:
|
256. |
The process of consolidating concrete mix after placing it in position is termed as |
A. |
curing |
B. |
wetting |
C. |
compaction |
D. |
none of these |
Answer: Option C
Explanation:
|
257. |
When the concrete mix is too wet, it causes |
A. |
segregation |
B. |
low density |
C. |
excess laitance at the top |
D. |
all of these |
Answer: Option D
Explanation:
|
258. |
The factor which effect the quality of compaction, is |
A. |
density of concrete |
B. |
strength of concrete |
C. |
durability of concrete |
D. |
all of these |
Answer: Option D
Explanation:
|
259. |
For compacting large sections of mass concrete in structures, the type of vibrator used is |
A. |
internal vibrator |
B. |
screed vibrator |
C. |
both (a) and (b) |
D. |
either (a) or (b) |
Answer: Option A
Explanation:
|
260. |
For compacting plain concrete or one-way reinforced concrete floors, the vibrator used is |
A. |
internal vibrator |
B. |
screed vibrator |
C. |
form vibrator |
D. |
all of these |
Answer: Option B