Engineering :: Concrete Technology
|
|
|
|
|
271. |
After the curing of 28 days, the concrete gains strength upto |
Answer: Option C
Explanation:
|
272. |
Proper curing of cement concrete, is good for its |
A. |
volume stability |
B. |
strength |
C. |
wear resistance |
D. |
all of these |
Answer: Option D
Explanation:
|
273. |
Under normal circumstances, the beam soffits may be removed after |
A. |
2 days |
B. |
7 days |
C. |
14 days |
D. |
21 days |
Answer: Option B
Explanation:
|
274. |
Vertical sides of columns may be stripped after |
A. |
1 to 2 days |
B. |
7 days |
C. |
14 days |
D. |
21 days |
Answer: Option A
Explanation:
|
275. |
In concrete walls, construction joints should be provided at the |
A. |
floor level |
B. |
soffit level of lintels |
C. |
sill level of windows |
D. |
all of these |
Answer: Option D
Explanation:
|
276. |
The construction joints in cement concrete |
A. |
should be located where bending moment is large |
B. |
should be located where shear force is large |
C. |
should not be provided at the corners |
D. |
should be spaced at a distance of 3 m apart in case of huge structures |
Answer: Option C
Explanation:
|
277. |
The construction joints are generally provided in concrete |
A. |
roads |
B. |
retaining walls |
C. |
lining of tunnels |
D. |
all of these |
Answer: Option D
Explanation:
|
278. |
The most useless aggregate is, whose surface texture is |
A. |
smooth |
B. |
glossy |
C. |
granular |
D. |
porous |
Answer: Option B
Explanation:
|
279. |
The bulk density of aggregates depends upon its |
A. |
shape |
B. |
grading |
C. |
compaction |
D. |
all of these |
Answer: Option D
Explanation:
|