Engineering :: Mechanical Measurements
|
|
|
|
|
|
The 'dead time' of the instrument is
|
[A]. |
The time required by an instrument for initial warming up | [B]. |
The time required by an instrument to begin to respond to a change in the measured value
|
[C]. |
The largest change of input quantity for which there is no output of the instrument | [D]. |
None of the above |
|
|
|
|