If during operation of a boiler one of the riveted joints is found leaking
|
| [A]. |
The boiler is stopped immediately | [B]. |
All the riveted joints are reopened and gain riveted
|
| [C]. |
Depending upon the zone of boiler in which the joint leaks, decision is taken | [D]. |
The joint is repaired if in low pressure zones otherwise boiler sent for repairs |
| [E]. |
None of the above |
|
|
|
|
|
|