https://www.geekmcq.com/
CSS Solved Papers
Physics Chemistry

Engineering :: Surveying


  It is required to find the difference in elevation between two points A and B. During levelling, it is found that the staff reading at B is more than the staff reading at A. It indicates that the point A is

Write your comments here:
Name *:     Email:

© 2012-2024 by GeekMCQ™ Technologies. All Rights Reserved | Copyright | Terms of Use & Privacy Policy | Referals

Contact us: info@geekmcq.com