Engineering :: Irrigation Engineering
|
|
|
|
|
|
Cross regulators are provided
|
[A]. |
to raise the water level to its upstream during the periods of low discharges in the parent channel | [B]. |
to help in closing the supply to down stream of the parent channel
|
[C]. |
to absorb fluctuation in various sections of the canal system | [D]. |
all of the above |
|
|
|
|