https://www.geekmcq.com/
CSS Solved Papers
Physics Chemistry

Engineering :: Irrigation Engineering


  In a canal section, which is in partial filling and partial cutting
[A]. the full supply level of the canal is above the natural surface level[B]. the bed level of the canal is below the natural surface level
[C]. the full supply level of the canal is below the natural surface level[D]. the bed level of the canal is above the natural surface level
[E]. both (a) and (b)    

Answer: Option E


Write your comments here:
Name *:     Email:

© 2012-2024 by GeekMCQ™ Technologies. All Rights Reserved | Copyright | Terms of Use & Privacy Policy | Referals

Contact us: info@geekmcq.com