Engineering :: Highway Engineering
|
|
|
|
|
|
Which of the following statement is correct?
|
[A]. |
The sub-base course is composed of hard well burnt clinker natural gravel or any other suitable material excavated at or near the site. | [B]. |
The base is composed of broken stone and granular material with tar.
|
[C]. |
The wearing surface in the case of flexible pavement consists of a mixture of bituminous material and aggregate. | [D]. |
all of the above |
|
|
|
|