https://www.geekmcq.com/
CSS Solved Papers
Physics Chemistry

Engineering :: Highway Engineering


  At the end of the reconnaissance phase, the selected alignment is pegged by using about 2m high poles on which the
[A]. number of peg is marked[B]. direction of proposed alignment is marked
[C]. distance between the two pegs is marked[D]. all of these

Answer: Option D


Write your comments here:
Name *:     Email:

© 2012-2024 by GeekMCQ™ Technologies. All Rights Reserved | Copyright | Terms of Use & Privacy Policy | Referals

Contact us: info@geekmcq.com