https://www.geekmcq.com/
CSS Solved Papers
Physics Chemistry

Engineering :: Highway Engineering


  A track of width 1 to 1.2 m constructed along the selected alignment to facilitate access to the area for inspection and detailed survey is known as
[A]. inspection trace[B]. terrain
[C]. trace out[D]. all of these

Answer: Option C


Write your comments here:
Name *:     Email:

© 2012-2024 by GeekMCQ™ Technologies. All Rights Reserved | Copyright | Terms of Use & Privacy Policy | Referals

Contact us: info@geekmcq.com