Engineering :: Concrete Technology
|
|
|
|
|
|
According to IS : 269 - 1976, the requirement of an ordinary Portland cement is that
|
[A]. |
the residue does not exceed 10% when sieved through IS sieve No. 9 | [B]. |
its expansion is not more than 10 mm for unaerated cement
|
[C]. |
its initial setting time is not less than 30 minutes | [D]. |
all of the above |
|
|
|
|