Engineering :: Business Management
|
|
|
|
|
61. |
A gantt chart provides information about |
A. |
Sales |
B. |
Inventory |
C. |
Machine utilisations |
D. |
Rejections |
E. |
Production schedule |
|
|
Answer: Option E
Explanation:
|
62. |
Queuing theory is associated with |
A. |
Production time |
B. |
Inventory |
C. |
Sales |
D. |
Inspection time |
E. |
Waiting time |
|
|
Answer: Option E
Explanation:
|
63. |
Locating an individual onject from a group is |
Answer: Option A
Explanation:
|
64. |
A good organisation requires that |
A. |
Every body should feel responsibility |
B. |
Every body should be authorised to get any work done for expeditious disposal |
C. |
Frequent change in responsibility so that every body gets the taste of every job |
D. |
Communication system should be dull so that secrets do not leakout |
E. |
Responsibilities should be clearly defined |
|
|
Answer: Option E
Explanation:
|
65. |
The salient feature of functional organisation is |
A. |
Work is properly planned and distributed |
B. |
Strict adherence to specifications |
C. |
Each individual maintains functional efficiency |
D. |
Separation of planning and design |
E. |
All of the above |
|
|
Answer: Option E
Explanation:
|
66. |
Machine loading means |
A. |
Total load of machine + load of job |
B. |
Load of machine + load of heaviest job that machine can take |
C. |
Load of machine + load of heaviest job that machine can take |
D. |
Electrical load required for the machine motors |
E. |
Amount of work assigned to a machine |
|
|
Answer: Option E
Explanation:
|
67. |
Bin cards are used in |
A. |
Machine loading |
B. |
Accounts |
C. |
Stores |
D. |
Quality control |
E. |
Preventive maintenance |
|
|
Answer: Option C
Explanation:
|
68. |
PERT stands for |
A. |
Project estimation and return times |
B. |
Planning estimation, review techniques |
C. |
Project evaluation and review techniques |
D. |
Puching edging and review techniques |
E. |
Precise Estimation and Results Technique |
|
|
Answer: Option C
Explanation:
|
69. |
PERT analysis is based on |
A. |
Optimistic time |
B. |
Pessimistic time |
C. |
Most likely time |
D. |
All the above |
E. |
None of the above |
|
|
Answer: Option D
Explanation:
|
70. |
PERT is |
A. |
Based on one time estimates |
B. |
Synthesis in concepts |
C. |
Used for repetitive works |
D. |
Built of activities oriented programme |
E. |
All of the above |
|
|
Answer: Option E
Explanation:
|
Read more:
|
|