https://www.geekmcq.com/

Entry Test MCQ :: Time and Work Problems


1.  If an inlet pipe fills a tank in 10 hrs then part of tank filled in 1 hr.
A. 1?5 B. 1?10
C. 1?15 D. 1?8

2.  If part of tank filled in one hour = 1/10 then time required to fill the tank.
A. 8 B. 12
C. 10 D. 15

3.  If an inlet pipe fills a tank in 10 hrs and another inlet pipe fills the same tank in 5 hrs then time required to fill the tank when both pipes are opened.
A. 10?3 B. 3?10
C. 1?3 D. 3

4.  If an outlet pipe empties a full tank in 20 hrs then part of tank emptied in one hour.
A. 3?20 B. 2?5
C. 1?10 D. 1?20

5.  An inlet pipe can fill a tank in 10 hrs and an outlet pipe empties the same full tank in 20 hrs. The time required to fill the tank when both pipes are opened.
A. 10 B. 20
C. 30 D. 25

6.  If A can do a piece of work in 10 days then part of work done by him in one day.
A. 2?5 B. 3?8
C. 1?10 D. 3?7

7.  If As 1 days work = 1/20 then time required to finish the job (in days)
A. 20 B. 10
C. 25 D. 30

8.  If A can do a job in 10 days another person B can do the same job in 20 days then time required to do the job when both of them working todether.
A. 1?30 B. 3?20
C. 1?10 D. 20?3

9.  Alia can complete an assignment in 5 days and Babar can complete the same assignment is 20 days. The time taken by both Alia and Babar to complete the assignment working together is
A. 3 days B. 5 days
C. 4 days D. 2 days

10.  Asghar can do a job in 60 days. And both Asghar and Babar can do the same job in 20 days working together. Babar alonge can do the some job in
A. 30 days B. 60 days
C. 28 days D. 45 days




© 2012-2024 by GeekMCQ™ Technologies. All Rights Reserved | Copyright | Terms of Use & Privacy Policy

Contact us: info@geekmcq.com